Sunday, October 14, 2007
New construction or gotta ways to go construction?
We toured Long Island City with Lynn yesterday, the site of our newly purchased apartment and even got to go inside our unit - although as you can see, there was not much to check out except maybe the view. The layout of the unit was there but that was about it - no floors, dry wall or ceiling, there were lots of electrical wires and pipes jutting out, drawn outlines where our countertops are supposed to be, our bathtub hanging out solo in the smaller bathroom - we did have windows!
Maybe a January closing date is a little optimistic, fine by us.
Subscribe to:
Post Comments (Atom)
1 comment:
Umm. Needs a wall or two. Love it! Nice work you two!
Post a Comment